Skip to content
FixAhead
Menu
Log inBook a demoStart freeStart free

HVAC maintenance software: proof of every PM

Give the building owner a signed report for each unit's visit, backed by required checklist steps and photos from the rooftop.

The quarterly filter change on Pinecrest RTU-1, Completed with its four tasks ticked, and its Service Report signed.
A rooftop unit's signed PM report

Schedule every unit under its maintenance agreement

Set recurring filter changes, coil cleaning, and seasonal inspections by calendar for each unit, and each work order arrives ahead of its due date.

Preventive Maintenance with four PMs and their Next Due: the quarterly filter change on Pinecrest RTU-1, due in 86 days, and on RTU-2, due in 76 days; Sorensen CH-1's 500-hour service, due in 270 hrs; and Harbor Street Lofts Boiler B-1's fall startup, due in 3 days; with the boiler's fall startup work order, Low, Assigned.
Each unit's PM with its next due, the soonest already a work order

Prove what happened on each visit

Document every service call on Android. Technicians get push notifications for new assignments and complete required checklist tasks and photos before marking the job complete.

  • A checklist for the visit. Attach the procedure to the PM schedule, and every generated work order carries the same required tasks.
  • Photos at the unit. Add several photos to a task from the phone, with a photo required on any check you choose.
  • PM compliance by unit. See each unit's scheduled, completed, and overdue PMs with its compliance percentage.
An Android phone with no signal showing WO-5, PM: Pinecrest RTU-1 - Quarterly filter change, Completed, its four tasks ticked and the cleaned coil photographed, beside Pinecrest RTU-1 on the Roof with Javier Rios.
A unit's checklist, its required photos taken

Know each unit and what went into it

Each unit keeps the details your technicians need, and technicians log parts from the service call on their phone before leaving the site, updating stock when the work order is complete.

  • Fields for each unit category. Choose from 9 field types for the details your technicians need at the unit.
  • Parts and refrigerant logged on the call. Record filters, belts, and refrigerant used against the unit and its work order, up to the quantity reserved, with quantity and cost.
  • Low Stock before the next visit. Get an alert at each filter, belt, or refrigerant part's minimum stock.
Pinecrest RTU-1's details, Model 48FC-12, Serial number 2419G30187, Filter size 20 x 20 x 2, 4, Belt A42, and Restore cooling, Pinecrest suite 104, High, Closed, with 1 of 1 dual run capacitor and 1 of 1 contactor used.
A rooftop unit's details, with the parts used on its repair

Let customers report from the unit

The site's contact scans the QR code on the unit and reports with a photo and no account, and the issue reaches you with its site and unit attached.

A phone held to the FixAhead QR label beside St. Brendan RTU-A's disconnect switch, and the report form it opens, already naming St. Brendan RTU-A on the Gym Roof, with Gym unit rattling typed above Report an issue.
The report form a QR code opens, the unit already named

How a five-site HVAC contractor would run it

Say you run a commercial HVAC service company: you and four technicians, with service agreements on five customer sites, from a medical plaza's rooftop units to a tool shop's chiller and a school gym's unit. Each customer site and its units sit in the location tree, and each unit's PM work order arrives on time.

  • Calendar or running hours. Quarterly filter changes by calendar, and the chiller's 500-hour service from the hours you enter.
  • Work on the roof without signal. The technician completes the tasks and photos offline, and the record syncs from the van.
The Sorensen CH-1 chiller in its yard, named with its location, Chiller Yard, beside Brisklane Mechanical's asset tree: five customer sites, Pinecrest Medical Plaza, Sorensen Tool and Die, Midvale Public Library, Harbor Street Lofts and St. Brendan Parish School, with Sorensen's Chiller Yard marked, holding Sorensen CH-1.

From the maintenance blog

How it works

Each unit's PM comes due, gets done with proof on the roof, and goes to the building owner signed.

  1. Step 1

    The PM comes due

    A calendar PM's work order arrives ahead of its due date, an hour-meter PM's when the reading reaches it, with its checklist attached.

  2. Step 2

    The technician works the unit

    They tick the required tasks on Android and add the photos the checklist asks for.

  3. Step 3

    Parts go on record

    Filters, belts, and refrigerant used are logged against the unit and the job.

  4. Step 4

    The owner gets the report

    Share the signed report by link, or send the work order as a PDF.

Free maintenance templates

Checklists and forms for your trade's equipment, each ready to download and use.

Questions HVAC teams ask before they start

Do I pay for every technician?

Not when you pay by assets: users have no limit, so all your technicians get logins.

Can you load our unit list?

Yes. Send us your spreadsheet and we load it free, or import it from the asset template and see each flagged row before it loads.